Six short, self-guided primers for people working at the intersection of waste, energy, infrastructure, and community priorities.
Read a primer, check your understanding, and use the project prompt. These are introductory learning resources, not accredited courses or technical certification.
For municipal staff, project sponsors, and community organizations.
1. Define the service, not the equipment
Start with the public or operating need: safe waste management, fewer disposal constraints, reliable refrigeration, or an agreed hydrogen supply. Record the existing service, its costs, the people affected, and the authority responsible for the decision. A preferred technology is an option to test, not the problem statement.
2. Make the next decision explicit
Identify the evidence needed to choose the next step. Early work might resolve waste composition or energy demand before any feasibility study. Later work might test a sample, validate an offtake assumption, or prepare procurement. Include who can approve the work, what it costs, and what would cause the project to stop.
Put it into practice
Write one sentence for the service need. Add the baseline, affected stakeholders, decision owner, and the next decision.
For waste authorities, facility operators, and project developers.
1. Define the boundary
Record input tonnes on a stated wet or dry basis. Identify source separation, recyclable recovery, treatment, downstream processing, residues, and disposal. Volume reduction is not the same as mass reduction, recycling, or avoided emissions. A composting stage cannot be left out when a reduction figure includes it.
2. A product needs a destination
A usable output needs consistent quality, testing, applicable approvals, handling arrangements, and an actual market. Pasteurization addresses biological conditions; it does not prove that metals or persistent chemicals have disappeared. Include condensate, emissions, off-spec material, downtime, and final residues in the assessment.
Put it into practice
List each input and output, its quantity and basis, test requirements, destination, and the party responsible.
For energy managers, industrial operators, and public decision-makers.
1. Begin with demand
Define the required service: heat, vehicle fuel, industrial hydrogen, or backup power. Compare energy efficiency, direct electrification, batteries, and hydrogen under the same reliability and operating requirements. Hydrogen storage may serve a useful role, but conversion and downstream equipment have costs and losses.
2. Keep the production pathways distinct
Electrolysis needs electricity and specification-grade water. Waste-derived hydrogen needs qualified feedstock, preparation, conversion, cleanup, and a carbon-management route. For either pathway, ask for net delivered output, complete-system energy use, maintenance, safety, emissions boundaries, and a credible end user. A hydrogen-production rating does not describe electricity supplied back to a facility.
Put it into practice
Define the end-use demand and operating profile. Compare at least one non-hydrogen alternative and list complete-system requirements.
For community organizations, sponsors, and local government.
1. Start with community priorities
Ask who hosts the project, who bears its impacts, and who should help set priorities. Training, local procurement, environmental education, and food resilience are possible topics—not a substitute for addressing project impacts. Separate legal requirements from negotiated commitments and optional contributions.
2. Give the commitment a structure
Document the payment basis, start date, duration, eligible uses, governance, beneficiaries, reporting, and what happens if operations change. A dollars-per-MW-per-year commitment differs from a payment per MWh generated or a share of revenue. Confirm local rules before choosing a model. Hawaiʻi’s cited Stage 3 requirement is procurement-specific.
Put it into practice
Draft a benefit framework with local priorities, funding basis, governance, reporting, and review dates.
For food organizations, farmers, local government, and energy planners.
1. Connect the infrastructure questions
Local food production also needs processing, storage, dependable energy, distribution, and access to markets. A useful project brief might focus on cold-chain reliability or recovering edible food. Avoid assuming that energy technology alone resolves land access, affordability, or cultural priorities.
2. Protect the material stream
Source-separated food and green waste should be assessed distinctly from mixed municipal residuals. Soil amendments need quality testing and permitted uses. Food sovereignty includes the ability of communities to shape their food systems; farmers and Native Hawaiian practitioners should help lead the discussion, rather than being treated only as project beneficiaries.
Put it into practice
Choose a local food-system bottleneck. Identify affected producers, infrastructure needs, and the evidence needed to evaluate an intervention.
For coastal organizations, utilities, and municipal project teams.
1. Separate the workstreams
Sewage treatment, trash interception, sediment handling, and residual disposal are connected but distinct. Start by identifying the material owner, collection point, current handling route, and existing agency programme. Never assume a captured stream is suitable for a technology without characterization.
2. Assess a complementary role
A recovery or energy assessment should support the existing treatment and pollution-control work. Compare permitted handling routes, drying and transport costs, energy alternatives, and safe product destinations. For a Tijuana River concept, sampling, permissions, operator engagement, and independent engineering come before any integrated-system claim.
Put it into practice
Map capture, handling, assessment, product use, and residual disposal. Mark every unconfirmed interface.